After Builders Cleaning across Thurrock, Essex, London and Kent
Post-construction cleaning for domestic renovations, commercial refurbishments and new builds — from a single-room kitchen fit-out to multi-unit handover cleans.

- Agreed scope and records
- Family-run business
- Transparent pricing
- Before & after photos
- Digital job records
- Cleaning & maintenance under one roof
After Builders Cleaning — Starting Prices
Every post-construction clean is quoted individually. The figures below give a starting guide — send us site photos and the project details and we'll come back with an accurate price.
Single Room or Small Area
from £90
One room after kitchen/bathroom installation, plastering, or decorating. Dust removal, surfaces, floor.
Get a QuoteMost common enquiry
Flat or Apartment
from £200
1–2 bedroom flat after refurbishment. All rooms post-build cleaned including kitchen, bathrooms and floors.
Get a QuoteHouse or Commercial Site
from £325
3+ bed property or small commercial site. Full post-construction clean — all areas, all surfaces, all floors.
Get a QuoteWhy after builders cleaning must be quoted individually
Post-construction cleaning varies more than almost any other cleaning service. Two properties of identical size can take radically different effort depending on:
Site photos improve accuracy significantly. Send us a few images of the current state and we'll quote more precisely than any size-based online calculator can.
What After Builders Cleaning Removes
If you've just finished a renovation, you'll recognise most of these. This is the mess a post-construction clean is designed for — not an ordinary domestic tidy.
Why Construction Dust Is Different
Construction dust isn't the same as ordinary household dust. Fine plaster dust, drywall particles and sanding residue are much finer than domestic dust — and they behave differently. Disturbing them with an ordinary vacuum or cloth doesn't remove them; it redistributes them.
How post-build dust spreads
- →Settles on every horizontal surface — floors, ledges, tops of frames, cupboard surfaces
- →Penetrates radiators, socket covers and light fittings
- →Coats joinery and fitted storage inside and out
- →Resettles on glazing and window boards repeatedly
- →Accumulates on high surfaces that ordinary cleaning misses
- →Can continue resettling for days if disturbed rather than removed
What a post-construction clean requires
- Working top-to-bottom in a fixed sequence so dust isn't redeposited on cleaned surfaces
- Appropriate equipment for fine airborne particles — not redistributing them
- Treating each surface type (glass, new timber, stone, vinyl) correctly without damaging new finishes
- Returning to floors only after all elevated surfaces are complete
- Attention to detail on surfaces that tradespeople were working around, not cleaning
- Understanding when trade residue requires specialist treatment vs routine removal
A post-construction clean is a deliberate process, not an extended domestic tidy. The sequence, method and surface awareness make the practical difference between a clean that lasts and one that leaves a fine haze on every surface within 24 hours.
After Builders Clean vs Deep Clean
Both involve detailed cleaning, but they are designed for different situations. Choosing the wrong one means the actual contamination — or the actual dirt — doesn't get addressed properly.
After Builders Clean
- Specifically designed for post-construction and post-refurbishment contamination
- Removes construction dust, plaster residue, trade contamination and adhesive
- Works around new, potentially sensitive finishes and surfaces
- Sequenced to prevent dust resettling on already-cleaned areas
- Treats floor types appropriately after a renovation
- Often requires removal of labels, films and installation packaging
- May include builders clean, sparkle clean or both depending on project stage
Standard Deep Clean
- –Designed to address accumulated domestic dirt, grease and hygiene
- –Removes kitchen grease, bathroom limescale, built-up grime
- –Assumes ordinary domestic surface types
- –Not specifically structured for construction residue removal
- –Does not account for construction dust resettling behaviour
- –Not designed to treat trade-specific contamination (adhesive, grout haze, paint)
- –More appropriate for move-ins, spring cleans, or post-occupation resets
If you've just finished a renovation, extension or fit-out, always book an after builders clean — not a standard or deep clean.
Builders Clean vs Sparkle / Final Handover Clean
These are two distinct stages of post-construction cleaning. Not every project needs both. Which applies depends on your project scale, stage, and what the property needs to be ready for.
Builders Clean
The post-trade clean
Removes the bulk of construction dust, residue, trade contamination and cleaning debris following building, renovation or refurbishment works. Carried out after the main dust-producing trades have finished.
- All construction dust top to bottom
- Paint splashes, adhesive and residue
- Skirting boards, door frames, architraves
- Floor dust and debris cleared
- Internal windows and glass cleaned
- Kitchen and bathroom installation residue
Sparkle / Final Handover Clean
The pre-occupation presentation clean
A higher-detail finish clean carried out when works are substantially complete and the property needs to be presented for handover, viewing, photography, occupation or opening.
- Detail-clean of all surfaces to presentation standard
- Glass and mirrors polished streak-free
- Final sticker and film removal from fittings
- Sanitary ware cleaned and polished
- Kitchen and appliance fronts presentation-clean
- Final floor clean — all types
Which do you need?
Small domestic projects — a new kitchen, bathroom, or single-room renovation — usually require one thorough post-build clean. Larger projects — full house renovations, new builds, commercial fit-outs — may benefit from a builders clean when the main works complete, followed by a sparkle clean when the property is ready to present. Tell us your project stage and we'll recommend the right approach.
Discuss Your Project Stage →Common Domestic Renovation Scenarios
You don't need a large construction project to need an after builders clean. Most of our domestic work comes from ordinary home improvements where the trades have done excellent work — and left a very dusty property behind.
Extension completed
Dust, debris and plaster residue throughout — not just in the new room. Post-extension dust travels.
New kitchen installed
Dust from cutting, filler around plinths, marks on surfaces, films on appliances. Common first-clean scenario.
New bathroom fitted
Tile grout haze, adhesive residue, sealant on fixtures, installation packaging debris, floor residue.
Plastering completed
Fine plaster dust settles on every surface in the property — not just the room worked on. Thorough top-to-bottom clean required.
Decorating finished
Paint splashes, roller spatter, frame marks and dust from sanding. Often combined with another trade's clean.
Loft conversion
Insulation and building dust throughout the property. Often neglected staircase and landing areas.
Flooring installation
Sawdust from cutting, adhesive residue, floor levelling compound dust, protective film removal.
Full house refurbishment
Multiple trades, multiple residue types, multiple floor finishes. Full post-refurbishment clean — builders and sparkle.
After any trades combination
Mixed residue from multiple trades in the same property is standard. We scope to what's actually there.
For Builders, Developers & Contractors
Construction Cleaning as a Contractor Partnership
Coordinate cleaning across project stages and sites, with cleaning and related maintenance scoped through one contact.
What contractors need that ordinary cleaning doesn't cover
- →Cleaning that can work around a live construction programme — not just a post-work service
- →Phased cleaning at defined stages, not one visit at the end
- →Multi-unit capability — cleaning 4 flats, 10 houses or a commercial floor to the same standard
- →A handover clean that actually meets the client's or agent's inspection standard
- →Programme and access arrangements agreed before attendance
- →Cleaning and snagging/maintenance co-ordinated through one subcontractor
- →Show home or marketing suite presentation standard where required
- →Communal areas, staircases and external areas as part of the scope
What Multrex can offer your construction programme
- Builders clean, sparkle clean and phased cleaning scoped to your programme
- Multi-unit residential developments — flats, houses, mixed-use
- Commercial fit-out and refurbishment cleaning
- Office, retail and workspace cleans after fit-out
- Show homes and marketing suite presentation cleaning
- Communal and external areas included where agreed
- Related snagging, repairs and maintenance available through Multrex
- Single point of contact across the project — not multiple cleaning contractors to manage
Working on a project — or multiple?
We discuss the programme, released areas and handover standard with your site contact, then scope each phase clearly so cleaning can be coordinated with the remaining trades.
Discuss a Project →Phased Construction Cleaning
For larger projects, one clean at the end isn't always practical or commercially optimal. Phased cleaning — where we clean at defined stages throughout the build — can be more effective, keeps the site workable between visits, and avoids a single massive handover clean under time pressure.
Stage / initial builders clean
After the main dust-producing trades finish. Removes the bulk of construction contamination and gives remaining trades a clean working environment.
Interim clean
After any further snagging, trades returning, or additional works. Keeps the site in a presentable condition without waiting for final completion.
Sparkle / handover clean
The final presentation clean before handover, occupation, photography, or opening. Highest detail level — every surface, every fitting.
The phased programme is scoped around your actual project timeline — we don't impose a fixed three-stage template where it doesn't suit the work. Tell us the project stage and programme and we'll propose the appropriate approach.
What Gets Cleaned — Every Area
Post-construction cleaning works through every area systematically. The scope below reflects a full property clean — single-area or partial cleans are scoped and confirmed at quote stage.
Kitchens
- Worktops, upstands and splashbacks
- Cabinets exterior and interior where included
- Sinks, taps and mixer cleaned
- Appliance exteriors and installation marks
- Floor — post-installation dust and residue
- Protective film removed from new surfaces
- Labels removed from new appliances and fittings
Bathrooms & En Suites
- Sanitaryware — cleaned and residue removed
- Tiles — grout haze where safely treatable
- Shower screen glass and frame cleaned
- Fittings and fixtures cleaned
- Cabinets and storage wiped
- Post-installation labels and films removed
- Floor — tile, vinyl or stone post-installation
Living Rooms & Bedrooms
- Walls dusted where appropriate
- Skirting boards and door frames detailed
- Window boards and sills
- Radiators dusted top, fins and sides
- Light switches and socket covers wiped
- Fitted storage inside and out
- Floors — hard floor or carpet according to type
Hallways, Stairs & Commercial Areas
- Banisters and spindles dusted and wiped
- Stair treads and risers
- Skirting boards throughout
- Ledges and high horizontal surfaces
- Doors and door frames
- Floors — stairs and hallways last
- Commercial: entrances, communal areas, washrooms, welfare
Windows, Floors and New Finishes
Construction work leaves specific marks on glass, and post-installation floors require care. New surfaces are often sensitive — the correct approach removes the residue without damaging what the trades just installed.
Windows & Glass
- Internal glass — always included
- Window frames and sills
- Sticker and film removal from new windows
- Paint splashes on glass — where safely removable
- External glass — quoted separately
- High-level access — specialist access where required
We do not promise removal of scratches, etched glass or permanent construction damage to glass surfaces.
Floors
- Tile — grouted and set (appropriate treatment)
- Laminate and LVT — residue removed correctly
- Vinyl — post-installation adhesive and dust
- Timber — sawdust, finishing residue
- Stone — appropriate to the surface type
- Carpet — dust removed or extraction where requested
Construction residues are treated according to floor type and finish. We don't apply aggressive cleaning chemistry to new sensitive surfaces.
New & Sensitive Finishes
Newly installed surfaces may be vulnerable. We adjust the cleaning approach for:
- Fresh paint — gentle cleaning only
- Natural and engineered stone
- New timber and solid wood
- Specialist surface finishes
- New sanitaryware and fittings
- Newly sealed surfaces
Tell us at quote stage if you have specialist finishes so we plan accordingly.
Important: Cleaning vs Builders' Waste Clearance
A post-construction clean removes cleaning-scale waste — dust, packaging, films, small debris. It does not include removal of substantial builders' waste such as rubble, plasterboard, timber offcuts, floor packaging, or general construction skip material.
Ideally, heavy building debris should be cleared before the cleaners arrive — it allows every floor and surface to be reached properly. If waste clearance is needed, this can be arranged as a separate service through Multrex or by your builder before our visit. Please flag this at quote stage so we can scope the job accurately.
When to Book an After Builders Clean
Timing matters. Booking too early — before all dust-producing trades have finished — can mean a clean that gets partially undone by subsequent work. Booking too late creates pressure on a handover or move-in date. Here's the practical guide:
Ideal: all dust-producing trades finished
Plastering, sanding, major cutting, and decorating should be complete before the final clean. If these continue afterwards, dust will reappear. For smaller projects, this often means booking the clean when the main works are done and only minor snagging remains.
Allow time before occupation or handover
Don't schedule the clean for the morning of handover or move-in. If anything needs attention — a surface we need to revisit, or a remaining snag — you'll have no time to address it. Build in at least a day's buffer where possible.
For larger projects — consider phased cleaning
If trades will continue working after an initial clean (returning for second-fix, snagging, carpet laying), a staged approach often makes more sense than one final visit under time pressure.
If trades return after the clean
Any trades working on-site after the post-construction clean can re-introduce dust and contamination. A follow-up sparkle clean addresses this — this is the most common reason two cleaning stages are booked on larger projects.
Book as soon as you have a projected trade-completion date
Don't leave the cleaning quote until the day before. We aim to respond quickly to enquiries, but giving us lead time means we can plan around your programme more reliably.
Are the Builders Finished?
A quick checklist before booking. If trades are still ongoing in several of these areas, a phased clean may be more practical than waiting for completion:
How to Prepare for the Clean
Preparation makes a material difference to the quality and completeness of the clean. The more access and information we have, the better the result.
Remove or arrange removal of heavy building debris
Rubble, plasterboard, packaging and skip material should be cleared before we arrive. It allows every floor and surface to be reached properly — including corners, skirting boards and behind fixed items.
Ensure dust-producing trades have finished
Where possible, ensure plastering, sanding, major cutting and decorating are done before the clean. Subsequent dusty work will partly undo a clean — if trades are returning, discuss a phased approach.
Provide water and electricity
The clean requires access to running water and electricity throughout. Ensure these aren't cut off before the job is complete.
Confirm access and logistics
Clear access to all areas — including storage cupboards, loft hatches if included, utility areas and outbuildings in scope. Confirm parking and any site security arrangements.
Identify delicate or specialist finishes
Flag newly sealed surfaces, specialist stone, fresh paint, or any surface type that needs specific care. The more we know in advance, the better we can plan the approach.
Leave protective films on until cleaning day
Keep manufacturer films on new windows, appliances and worktops until all other trades have finished. Remove them as part of — or just before — the clean, not earlier.
Identify any areas excluded from the clean
If certain rooms or areas are out of scope (occupied rooms, areas with ongoing works), confirm this at quote stage so the clean is scoped accurately and no time is wasted on-site.
Send photos with your enquiry
A few images of the current site condition — especially heavily contaminated areas, floor types, and any surfaces needing particular attention — allow us to quote more accurately and avoid surprises on the day.
One Team for the Final Project Turnaround
Multrex provides cleaning and property maintenance under one organisation. For renovation and refurbishment projects, this creates a practical advantage: the cleaning and the snagging/repairs can be co-ordinated without the customer managing two separate contractors.
A builders clean frequently uncovers what the dust was hiding — paint defects, incomplete finishing, loose fittings, sealant issues. The clean can move directly into snagging and repairs where Multrex maintenance is required, rather than the customer arranging a separate contractor for each issue found.
Builders complete
Main construction or refurbishment works finished — trades leave the site.
Builders / post-construction clean
Construction dust, residue, adhesive, films and packaging removed. Site or property cleaned to a workable standard.
Snagging and repairs
Clean surfaces reveal paint defects, incomplete finishing, loose fittings and sealant issues. Multrex can address these directly where within our maintenance scope.
Sparkle / handover clean
Where required, a final presentation clean to the standard needed for handover, occupation, photography or opening.
Occupation / handover / opening
Property ready for the client, tenant, buyer or public.
Ongoing: office, commercial or communal cleaning
Where required, post-handover cleaning can be scoped separately around the building's ongoing use.
Cleaning is always the primary scope
Multrex is a cleaning and maintenance company — not a building contractor. We do not perform structural work or specialist trade installations. Related maintenance services (handyman repairs, painting touch-ups, snagging) are available alongside the clean where within our genuine capability.
Recent Work
Genuine Post-Construction Projects
Real before-and-after evidence from completed after builders cleans — not stock photography.
Before & after photography
coming soon
Full house renovation · Grays, Thurrock
Post-refurbishment clean across 3 bedrooms, 2 bathrooms, kitchen and living areas. Plaster dust throughout, grout haze on new bathroom tiles, protective films removed from all glazing.
Before & after photography
coming soon
Kitchen fit-out · Hornchurch, Havering
Post-installation builders clean following new kitchen. Worktops, cabinet interiors, floor levelling compound residue, installation debris and appliance films.
Before & after photography
coming soon
Commercial fit-out · Basildon, Essex
Office refurbishment — full post-construction clean across two floors prior to staff occupation. Combined with handyman snagging works for client handover.
Photography added as jobs are completed. We do not manufacture evidence.
Our Process
What You Can Expect
From your first call to the finished job, here is how our after builders cleaning service works.
Share the project details — type of work, rooms affected, project stage, and your handover or move-in date. Site photos at this stage significantly improve quotation accuracy.
We review the information and quote based on the actual scope — size, contamination level, floor types, cleaning stage (builders clean, sparkle clean, or both) and access. No guesswork.
Any areas, finishes or constraints requiring specific attention are confirmed in writing before the clean begins. For larger projects, we confirm the programme and phasing.
On the day, we work room by room in a fixed top-to-bottom sequence. Dust and surface residue is removed before floors — never the other way around.
Each floor type is cleaned according to its finish — timber, stone, vinyl, tile and carpet all treated appropriately. Aggressive chemistry is never applied to new sensitive surfaces without confirmed compatibility.
Windows and glass, skirting boards, door frames and fittings are detailed after the main dust work. Protective films and labels are removed as the last surface pass.
Where we spot snagging issues — paint defects, loose fittings, incomplete sealing — we flag them. Multrex maintenance can address these where within our scope if required alongside the clean.
For phased projects, we confirm the next clean stage, re-visit date and programme before leaving site.
Insider Advice
Helpful Hints & Tips
Keep protective films on until cleaning day
Leave manufacturer films on new windows, appliances and worktops until all trades have finished. They are the best defence against marks during snagging. Remove them as part of the final clean — not before.
Builders' dust keeps resettling
Fine construction dust hangs in the air and can resettle on surfaces for days, particularly after activity in the property. If trades return after the clean, expect some re-deposition — a follow-up sparkle clean addresses this.
Send photos — it makes quotation more accurate
A few photos of the current site condition — especially the kitchen, bathroom tiles, any heavily contaminated surfaces and floor types — allow us to quote more accurately and reduce on-day surprises.
Ventilate the property while plaster dries
Fresh plaster and screed release significant moisture. Keep rooms ventilated in the first weeks to prevent condensation and mould establishing on new walls and surfaces.
Our Cleaning Satisfaction Guarantee
If any area included in your clean does not meet the agreed standard, notify us within 24 hours of completion and we will return to re-clean the specific area at no additional charge. This covers Multrex workmanship on the agreed scope — it does not extend to pre-existing staining, damage present before the clean, areas excluded from the scope, or issues arising from subsequent use of the property.
- Re-clean guarantee on any included area not meeting standard
- Notification within 24 hours of completion
- Covers our workmanship — not pre-existing conditions
- Does not guarantee landlord deposit return (subject to inventory assessment)
Common Questions
After Builders Cleaning — FAQs
Why Multrex
Post-Construction Cleaning and Maintenance Under One Roof
The combination of cleaning and maintenance means the clean doesn't have to be where the project ends.
Cleaning and Snagging Together
A builders clean reveals what the dust was hiding. Rather than managing a separate contractor for the snagging, Multrex can address both — cleaning and maintenance repairs in the same project window.
Domestic and Commercial
A single-room kitchen fit-out and a 20-unit residential development both get a site-assessed quote and a deliberate post-construction cleaning programme — not a one-size approach.
Built for Contractor Relationships
One domestic clean pays once. A contractor relationship spans multiple projects. We're interested in being the cleaning partner across your programme, not a single-visit subcontractor.
Get a Quote
After Builders Cleaning Quote
Three quick steps — then send your details. Site photos significantly improve quotation accuracy.
Standing in your property? Take a few photos of the current state and attach them to the enquiry — we'll quote more accurately and faster than any online calculator.
Step 1 — About your project
Project type
Project stage
I am a…
Builders, Developers & Contractors
Need Cleaning Across Multiple Projects?
A recurring contractor relationship represents far more commercial value than a single domestic clean. If you're a builder, refurbishment contractor, or developer looking for a reliable construction cleaning partner across your programme, we're happy to discuss how Multrex can support your projects — not just quote one job at a time.
Other Services Often Needed Alongside the Clean
Post-construction projects frequently require more than one service in the same window. These are the most common additions — all available through Multrex.
Waste Clearance
Rubble, packaging and building debris cleared before the clean begins — so every surface and floor can be reached properly.
Handyman / Snagging
Minor snagging and repairs following the builders clean. Loose fittings, incomplete finishing, minor defects — co-ordinated through one contact.
Painting & Decorating
Touch-ups after snagging, or full-room repaints where required. Completed before the final sparkle clean.
Carpet Cleaning
Hot water extraction after the main construction clean — once all dust-producing work is finished.
Window Cleaning
External window cleaning where required. Particularly useful for post-renovation properties being prepared for photography or occupation.
Pressure Washing
Paths, patios, car parks and external areas following construction work — often needed before a property is presented for handover.
Request a Quote
Get an After Builders Cleaning Quote
Tell us the project type, size, stage and your deadline. Site photos welcome — they make quoting faster and more accurate.
What do you need?
Choose a service and we'll give you a tailored quote form.
Cleaning
Maintenance & Property
Commercial & Industrial
We aim to respond the same working day.
